Our Phased Strategy for Growth
The school demonstrates great potential for growth due to its currently effective administration. To raise the school’s standards and allow it to compete fairly with institutions across the country, we propose the following phased projects:
Short-Term Projects (0–3 Months)
- Provide desks to ensure the comfort and proper seating of all students in the classroom.
- Develop an EdTech project design suitable for the school’s learning needs.
- Install proper soundproof partitions for shared classroom blocks to improve learner concentration.
- Fundraise for book donations for the scholars.
Medium-Term Projects (12–18 Months)
- Fundraise for the construction of a girl’s dormitory, three new classroom blocks, and an administrative block.
- Fully implement a pilot EdTech program in at least one class.
- Fundraise for and fence off the school with secure electric fencing.
- Conduct capacity building training for existing staff members.
Long-Term Goals
- Initiate a sustainable school feeding program incorporated with a school farm and a modern irrigation system.
- Mainstream EdTech in all classrooms in the school.
- Fully implement nutritional programs in line with the feeding program.
- Enhance staffing in the school to reduce the teacher-to-student ratio to a target of at least 1:25.
- Install a water purification system alongside a functional rain water harvesting system.